Background
The Hong Kong Baptist Hospital, founded 50 years ago, is an important healthcare setting with 800 beds and a staff strength of over 2200.
Purposes
This project arises from an intervention of expansion for the creation of a new department – the Block E – and, therefore, the installation of a cooling system which is capable of ensuring the maximum efficiency and reliability as well as a constant and safe operation. In addition to this, as it is a comfort cooling installation, it is also important that the system provides a quiet running.
Project
Geoclima Srl has developed four 1100 kW air-cooled Turbomiser units, with Turbocor centrifugal compressors.
Results
The chillers from Geoclima have demonstrated to be suitable for satisfying the client’s specific requirements, both in terms of efficiency and of reliability.